Key takeaways
- The east and north end went up from the 1950s to today, so supply pipe moves from galvanized and copper to Poly-B, Kitec and PEX as you head north.
- Palmer dates from the 1970s and Tansley Woods mostly from the 2000s, while Longmoor, Elizabeth Gardens and Pinedale have no confirmed decade, so the pipe is read instead.
- Growth planned around Appleby GO brings infill and additions that can outgrow an older water service from the street.
- Both lake plants filter the water, with membranes at Burloak, but neither removes the minerals that scale up a water heater.
One drive up Appleby Line, fifty years of pipe
Start at the lake and drive north on Appleby Line, and you pass houses from almost every period of Ontario plumbing. The streets near the water went up after the war. Palmer, west of the line, filled in during the 1970s. Headon Forest followed in the 1980s, Millcroft took about twenty years from 1986, and The Orchard arrived in the late 1990s on land that had been farmed.
North of Dundas Street, Alton Village began around 2006, and Tansley Woods, below Upper Middle Road, went up mostly in the 2000s. A plumber working the east end can open a cast iron stack in the morning and a PEX manifold after lunch. The age of the street is the first clue to what sits behind your walls, though a renovation can change the answer.
Supply pipe by decade in the east end
The dates below follow Ontario building practice, not a survey of any street. They tell you what to look for, and a look at the pipe settles it.
- 1950s and 1960s, Appleby: galvanized steel in the earliest houses, copper after, cast iron drains
- 1970s, Palmer: copper supply, with ABS drains replacing cast iron late in the decade
- 1980s, Headon Forest: inside the Poly-B years, about 1978 to 1995
- 1986 to the mid-2000s, Millcroft: Poly-B in the early phases, Kitec possible in later ones
- Late 1990s for The Orchard and the 2000s for Tansley Woods: Kitec stayed on the market until 2007
- 2006 on, Alton Village: PEX, the supply pipe still installed today
Copper joints could still be made with lead solder before the 1990s, one more reason to have older copper looked over.
Palmer and Tansley Woods, two areas without a page of their own
Palmer runs from the QEW up to Upper Middle Road, between Guelph Line and Appleby Line. Most of its houses date from the 1970s, with more added into the 1980s. At that age the original copper is often still sound, while the drain under the basement floor deserves a camera before anyone blames the sink. Houses finished at the end of the decade may carry early Poly-B.
Tansley Woods covers the Mainway to Upper Middle Road, from Walkers Line to Corporate Drive. It stayed rural into the 1990s and filled with bungalofts and townhomes after that. In a bungaloft the loft bathroom often sits over the main living space, so a slow leak at a tub shows first as a stain on the ceiling below. Townhomes share walls, and water can reach the unit next door before anyone sees it.
Longmoor, Elizabeth Gardens and Pinedale, where the date is unknown
Longmoor lies between New Street and the QEW, from Walkers Line to Appleby Line. Elizabeth Gardens runs from New Street down to the lake, between Appleby Line and Burloak Drive. Pinedale is on the eastern city limit. We have no confirmed build decade for any of the three, and we would rather say so than guess.
A house can still be dated from its plumbing. A Plumbing Burlington plumber reads the print on the supply pipe, checks whether the main stack is cast iron or ABS, and looks for the date many makers mark inside a toilet tank or on a heater label. Original fixtures are rare by now, so the pipe is the better witness. Once the era is known, the list above says what to check first.
Appleby, its creek and the growth near the GO station
Appleby is the oldest part of this guide, with streets from the 1950s and 1960s between the QEW and the lake. The City has carried out bank and drainage work on Appleby Creek, which deals with storm water. The sanitary sewer is a separate system run by Halton, and in a house of this age the floor drain rarely has a backwater valve in front of it.
Appleby GO is one of the three stations where council wants most new homes to go, under its 2023 pledge of 29,000 units by 2031. Near the station that means infill, bigger additions and new units on lots laid out for one bungalow. More fixtures can outgrow the original water service from the street. Halton's share of that pipe stops at the lot line, and every metre past it is yours. A larger service may need a permit.
Two lake plants and what the water does to your heater
Every street in this guide drinks treated Lake Ontario water from the Region's lake-based system, fed by three plants. The Burlington plant on Lakeshore Road near Wilton Street uses conventional filtration and is rated at 263 million litres a day. The Burloak plant is much smaller, at 55 million litres a day, and pushes its water through membranes.
Filtration of either kind takes out particles but leaves the dissolved minerals that turn to scale when water is heated. That is why tank heaters, tankless units and dishwasher valves in the east end scale up over the years, whatever pipe the house has. Flushing a tank heater once a year, and descaling a tankless unit on the maker's schedule, keeps that scale from cutting the heater's life short.
Neighbourhoods in this area
- Palmer
- Headon Forest
- Millcroft
- Tansley Woods
- The Orchard
- Alton Village
- Appleby
- Longmoor
- Elizabeth Gardens
- Pinedale
Services for this area
Kitec Plumbing Replacement
Need Kitec Plumbing Replacement in Burlington? Plumbing Burlington replaces Kitec lines and verifies tight, reliable service. Request a quote.
Repiping
Need Repiping in Burlington? Plumbing Burlington upgrades old piping and confirms everything holds under pressure. Schedule a quote.
Plumbing Home Inspection
Need Plumbing Home Inspection in Burlington? Plumbing Burlington inspects plumbing and explains what needs attention. Book an inspection.
Drains Camera Inspection
Need Drains Camera Inspection in Burlington? Plumbing Burlington inspects lines and provides a clear report. Book an assessment.
New Water Mains Connection Services
Need New Water Mains Connection Services in Burlington? Plumbing Burlington installs new services and verifies pressure and flow. Request an appointment.
Water Heater Repair
Need Water Heater Repair in Burlington? Plumbing Burlington repairs gas and electric heaters and verifies safe operation. Schedule a repair.
FAQ